Motorway |
4 Lanes |
Waste Water |
Activated sludge process Capacity is 30,000 ㎥ / Day |
Industrial Water |
|
Stormwater Treatment |
|
Electric Power |
50 megawatt power plant voltage 115 / 22KV |
Natural Gas |
PTT (through an underground pipe system) |
Telephone Line |
Direct line 1,700-3,000 lines |
Security |
Hot-line 1504 for accident open-time 24 hours |
Management Fee |
1,200 THB/m²
|
|
|
Remarks |
GM, AAL (a joint venture between FORD and MAZDA), SUZUKI, etc. are occupying an industrial park called Toyo Detroit. Most of the tenants are in the automotive industry. |